INDUSTRIAL
MODULAR BUILDINGS 

Quality and fast delivery is what we are known for. 

Our buildings are meticulously manufactured to meet exact customer specifications. At Maxx Power, we possess the expertise to manage projects of any scale from inception to completion, serving as your comprehensive solution provider throughout the process.

From initial design and engineering to final production, Maxx Power operates as a cohesive team dedicated to delivering exceptional results.

 

Our highly skilled fabricators not only execute tasks with precision but also proactively identify and communicate any potential issues to our engineering team for swift resolution. With over 150 years of combined experience, our fabricators adeptly handle challenges and engineering adjustments with efficiency. Upon identifying an issue, we promptly submit details to the customer and await approval before proceeding.

Maxx Power understands the importance of transparency and communication in project management. To keep our clients informed and facilitate seamless scheduling, we provide regular updates with descriptive photos, ensuring clarity on project status and remaining milestones. This commitment simplifies scheduling for our valued customers.

Building List 

MCC / SWITCHGEAR BUILDINGS

SCR / VFD BUILDINGS

GENERATOR CONTROL ROOMS 

ANALYZER BUILDINGS 

INSTRUMENT CONTROL ROOMS 

DRILLER CABINS

COMPRESSOR STATION CONTROL BUILDINGS 

MODIFIED CONNEX BUILDINGS

IMG_7744 (2).png

Design and Engineering 

We have partnered with a reputable third-party engineering firm specializing in modular buildings and structural design. Their expertise includes analyzing and producing detailed reports to meet environmental and state regulations. Upon customer approval of the building design, our engineering team collaborates with us to calculate and seal the drawings and reports with the designated state P.E stamp.

2

Constructing the Base 

Upon approval of the construction drawings, the base construction commences as the initial step. All materials for the skid are promptly ordered the same day as drawing approval, with construction starting the following day. The entire base is fabricated in-house, encompassing the structure, painting, coatings, and, per customer specifications, an optional anti-skid grit slip-proof finish on the top surface can also be applied. 

3

Wall & Roof kits 

We produce complete wall and roof kits entirely at our facility. Our press brake can efficiently bend panels up to 12 feet in length and handle plates up to 1/4 inch thick.

Considering assembling the building at your location? Maxx Power offers assistance by delivering the entire roof and wall kit to your facility. We handle the kit, you handle the assembly.

4

Paint, Coatings & Door Fabrication

Once a building enters the paint booth, it enters its final stages of completion. Buildings typically spend around 2-3 days in this stage for drying purposes, ensuring a durable finish. We offer a variety of coatings and colors to meet your specific requirements.

At Maxx Power, our doors and frames are 100% fabricated in-house, ensuring seamless project continuity without reliance on external suppliers. While the building is undergoing painting, there's a high probability that our doors will be ready for installation as soon as the building enters the shop floor, facilitating efficient workflow and timely project completion.

 

IMG_7706.jpg

FABRICATION

IMG_4412_edited.jpg

PAINT PREPERATION

IMG_7935.jpg
IMG_4411.jpg

PAINT

DELIVERY